美高梅官网

COMPANY BUSINESSES

Project for Dongxing Flyover of Tianjin Downtown Fast Road

Flyover of Olympic Forest Park

Jingjia Highway Overpass Project of the New Campus of the Graduate School of the Chinese Academy of S...

The overpass is located on the east side of the Management Cadre Institute of the Chinese Academy of Sciences (CAS) on Huaifeng Highway, Huairou District, Beijing, spanning over Jingjia Highway, and the east and west campuses of Huairou Campus of the Graduate School of CAS. The planned Jingjia Highway is a Grade I highway, and the red line width 70m. The overpass span is 45+60+46.5+4.5(m), a half-through steel oblique arch bridge with uniform section. The girder height is 1.0m, top width 5.0m and...

Cross-river Footbridge of the Capital Medical University

Both sides of cross-river footbridge are located in the campus of the Capital Medical University. The main bridge spans over Liangshui River and the trunk roads along both sides of the river. The footbridge is an important channel connecting the south and north campuses of the Capital Medical University, ensuring the safety of students and teachers and facilitating management of the university. Located in a complicated environment, the project faced many constraints and high requirements of span,...

Nanfeng Road Overpass Project of Shahe University Park of Beijing

The Nanfeng Road Overpass of Shahe University Park of Beijing is located in Shahe University Park of Changping District, spanning over Nanfeng Road and crossing Subway Changping Line. The structure system, in the I-shaped layout horizontally, consists of the continuous steel box girder, double-column pier and pile foundation. It is an important channel connecting the east and west campus of the Central University of Finance and Economics and plays a significant role in protecting the safety of st...

Beijing Liulichang Art Gallery Bridge Project

The Art Gallery Bridge of Beijing Liulichang is located on the south side of the crossing between South Xinhua Street and East and West Liulichang Street. It mainly functions as a bridge connecting the east and west sections of Liulichang, an overpass for passengers and a corridor for cultural exhibition. The project covers an area of 738.62m2, with a construction area of 365.87m2. The main bridge is 33m long and 4m wide. The upper part takes the design of ancient corridor with a round ridge roof...

Longhu Longxing Bridge Projectof Zhengzhou Zhengdong New District

Longxing Bridge (the bridge of Ruyi East Road crossing Longhu Lake) Project includes the bridge engineering, road engineering, lighting engineering, deck drainage engineering and cross-river pipe rack. The right road way (directed to the island) measures 205.373m long and the bridge section 158m and road section 47.374m; the left road way (direction of leaving the island) is 218.507m long, with the bridge section 159.2m long and road section 59.307m. The bridge span layout is 31+50+40+30 (m); the...

Chongqing Rail Transit Line 1 viaduct

Chongqing Rail Transit Line 1 (Shapingba section-University Town) measures about 20.708km, and the underground section is 6.954km long and the elevated section 13.644km. Located in the main area of Chongqing University Town, the elevated section uses U-shaped girder elevated structure to meet requirements on landscape, vibration and noise. In order to meet the requirements on spanning over the crossing and adapting to the double crossover area, the project takes a lead to use the U-shaped continu...

Longhu Longyin Bridge Project of Zhengzhou Zhengdong New District

Longhu Longyin Bridge Project of Zhengzhou Zhengdong New District includes the bridge engineering, lighting engineering, bridge deck drainage engineering and composite cross-river pipe rack. The bridge engineering includes the vehicle bridge and the footbridges on both sides. The vehicle bridge span layout is 37+50+37m and the bridge is 45.5m wide. The layout of footbridges on both sides is 23.5+50+29.2m and the bridge is 7~12m wide. The upper structure of the main bridge is the three-span contin...

TO BE A DESIGN-LEADING
INTEGRATED SERVICE PROVIDER FOR
URBAN CONSTRUCTION